The PE store-room was improved by stripping all existing fixtures and fittings and installing heavy duty, slatted shelving and conventional made to measure store cupboards.

In the staff room, an 8 metre made to measure oak finish; floor to ceiling storage unit, incorporated staff pigeon holes and computer stations was manufactured and fitted.

Notice boards were mounted in various areas around the school.